Dodge Neon DOHC cam tower stud kit
Applications
Dodge Neon
Installation Instructions
Part Number: 141‐1001
Application: CHRYSLER 2.0L & 2.4L DOHC
Cam Tower Stud ‐ Installation
[1]
Please check the part-number(s) for your application
against the part-number(s) listed on the instruction
sheet.
[2]
Clean and inspect all hardware prior to installation.
Look for obvious defects or shipping damages, plus
proper fit, length and dimension.
[3]
To ensure proper thread engagement and accurate
torque readings, clean the threads in the cylinder
head. Chase if necessary with a Thread Chaser or
Tap.
[4]
Screw the studs into the cylinder head “HAND TIGHT
ONLY”. Note: Loctite may be used if permanent
mounting of the studs is preferred.
[5]
Install the camshaft(s) and the camshaft caps as
described in the factory service manual.
[6]
Lubricate the stud threads, nuts and the washers with
ARP
ULTRA-TORQUE
FASTENER
ASSEMBLY
LUBRICANT. Then install the washers and the nuts
onto the studs and tighten them hand tight
[7]
Following the manufacturer’s recommended torque
sequence tighten the M6 nuts to 105 in‐lbs and
the M8 nuts to 250 in‐lbs using ARP ULTRA TORQUE
FASTENER ASSEMBLY LUBRICANT.
If you have any questions or need additional information
please contact us at (805) 339-2200 or by FAX at (805)
650-0742.
⚠ This is an automatically generated translation and unit conversion. Always refer to the original ARP instruction sheet for exact specifications. Errors may occur.