Ford Modular 4.6L 2V & 4V hex head stud kit

468,81
Price excluding VAT: 387,45
Our stock:
0 Items
Item No.:
156-4101

Ford Modular 4.6L 2V & 4V hex head stud kit

Delivery time: Out of stock at supplier, delivery time unknown (Supplier stock indication updated on: 09-05-2026 09:32. This status is an indication.)

Ford Modular 4.6L 2V & 4V hex head stud kit

Applications

Ford - Modular 4.6L
Ford 4.6L

Installation Instructions

REV 1 OCT 2016
Automotive Racing Products Tel: (805) 339-2200
1863 Eastman Avenue
Fax: (805) 650-0742
Ventura, Ca 93003
www.arp-bolts.com
INSTALLATION METHOD FOR
INSTALLATION METHOD FOR
INSTALLATION METHOD FOR
INSTALLATION METHOD FOR HEAD STUD KITS
HEAD STUD KITS
HEAD STUD KITS
HEAD STUD KITS
Part Number:
Part Number:
Part Number:
Part Number: 156
156
156
156-4101 & 156
4101 & 156
4101 & 156
4101 & 156-4301
4301
4301
4301 Application:
Application:
Application:
Application: Ford Modular 4.6L & 5.4L 2V/4V
Ford Modular 4.6L & 5.4L 2V/4V
Ford Modular 4.6L & 5.4L 2V/4V
Ford Modular 4.6L & 5.4L 2V/4V
1.
Inspect all hardware prior to installation. Look for obvious defects or shipping damages. Please call 800-
826-3045 with any questions or issues.
2.
To ensure proper thread engagement and accurate torque readings, clean all threads in the block. Chase
if necessary with ARP Thread Chaser, part number 912-0013 (M11 X 1.5)
3.
Clean the spot faces on the cylinder head where the washer seats, use of solvent or brake/carb
cleaner is recommended.
4.
Install the head gasket and cylinder head.
5.
Screw the studs into the block hand tight, do not apply torque. The hex broach in the end of the stud is
designed to assist with installing/removing the studs from the block, not for applying torque.
6.
Then, using a clean, dry rag remove all oil from both sides of each washer. The cylinder
head and washer mating surfaces must be free of oil/grease/lubricant. Failure to keep these
surfaces dry may result in inconsistent preloads.
7.
Place the washers over the studs and on to the dry, clean spot faces of the cylinder head.
8.
Lubricate the stud threads and bottom of the nuts with ARP Ultra-Torque Fastener Assembly Lubricant.
Then install the nuts onto the studs and tighten hand tight.
TORQUE PROCEDURE
TORQUE PROCEDURE
TORQUE PROCEDURE
TORQUE PROCEDURE
9.
Following the manufacturers recommended torque sequence, shown below, torque the nuts per steps 1-3
1- Tighten nuts 1 through 10 (11mm) to
25 ft-lbs (33.9 Nm)
2- Tighten nuts 1 through 10 (11mm) to
50 ft-lbs (67.8 Nm)
3- Tighten nuts 1 through 10 (11mm) to
70 ft-lbs (94.9 Nm)
Bolt Torque Sequence
Bolt Torque Sequence
Bolt Torque Sequence
Bolt Torque Sequence

⚠ This is an automatically generated translation and unit conversion. Always refer to the original ARP instruction sheet for exact specifications. Errors may occur.
Ford Modular 4.6L 2V & 4V hex head stud kit does not have any reviews yet. Share your experiences and post a review.
Ford Modular 4.6L 2V & 4V hex head stud kit

Meest recente reviews

Alternate products for Ford Modular 4.6L 2V & 4V hex head stud kit